Hyderabad Expressway Private Limited

 Project Overview
 

Hyderabad Growth Corridor Limited (A Joint Venture of HUDA and INCAP) has taken up the construction of eight-lane access controlled expressway as Outer Ring Road to Hyderabad City Phase-II A (Bongulur to Tukkuguda) from Km 108 to Km 121 – Contract Package – AP4 is part of Outer Ring Road to Hyderabad City. IL&FS Engineering Services is one of the Consortium members for the Concessionaire. The length of this project is 13 Km. This project has been awarded to the Concessionaire M/s Hyderabad Expressway Private Limited. The Outer Ring Road is to be formed to urban expressway design standards as a dual four-lane carriageway with service roads on either side. The proposed Outer Ring Road also serves as a bypass to important National Highways namely NH-7 and NH-9.

 
 Cost and Timeline
 
The cost of the project is Rs. 362 crores. The Construction Period is 30 months from the start of the project. The project started from December 20, 2007.
 
 Highlights
 
Location Hyderabad, Andhra Pradesh,
Client Hyderabad Growth Corridor Ltd.
Project
Construction of eight-lane access controlled expressway on BOT (Annuity) from Bongulur to Tukkuguda
Type BOT Annuity
Cost Rs. 362 crores
Timeline 30 months
Benefits
Will contribute to essential infrastructure development in Hyderabad. Will reduce the high traffic congestion in the main city, provides uninterrupted access to new developments like International Airport etc., and will serve as better transportation mode in future.
Road length Km 108 to Km 121
Length 13 Kms
Concessionaire Hyderabad Expressway Pvt. Ltd.
Total period 30 months