Cyberabad Expressway Private Limited

 Project Overview
 

Hyderabad Growth Corridor Limited ( A Joint Venture of HUDA and INCAP) has taken up the construction of eight-lane access controlled expressway as Outer Ring Road to Hyderabad City Phase-II (Narsangi to Patancheru) 23.700 Kms – Contract Package – AP2 From Km 12/0 to Km 23/700 ( Kollur to Patancheru) is part of Outer Ring Road to Hyderabad City. IL&FS Engineering Services is the contractor for this project. The long-term objective of the project is to construct a highway link to Hyderabad City in order to reduce the high traffic congestion in the main city, to provide uninterrupted access to new developments like International Airport etc., and to serve as better transportation mode in future.

The Phase – II Package –AP2, from Km 12/0 to Km 23/700 comprises of construction of eight-lane expressway to a length of 11.700kms includes Rotary Interchange, ROB, Patancheru Interchange and construction of Service Roads, Box, Slab & Pipe Culverts, Major & Minor Bridges, Pedestrian Under Passes , Vehicular Under Passes and construction of RE & Retaining Walls at specified locations between Kollur and Patancheru.

 
 Cost and Timeline
 
The cost of the project is 415 crores. The construction period is 30 months from the start of the project. The project start date is 20-12-2007.
 
 Highlights
 
Location Hyderabad, Andhra Pradesh,
Client Hyderabad Growth Corridor Ltd.
Project
Project Cyberabad Expressways Private Ltd., BOT (Annuity) Project - Construction of eight-lane access controlled expressway as Outer Ring Road to Hyderabad city  from Kollur to Patancheru
Type BOT Annuity (6 months annuity in total 12.5years)
Cost 415 crores
Timeline 30 months
Benefits
Will contribute to essential infrastructure development in Hyderabad.  Will reduce the high traffic congestion in the main city, provide uninterrupted access to new developments like International Airport etc., and will serve as better transportation mode in future.
Road length KM 12 to KM 23.7
Length 11.7 Kms
Concessionaire Cyberabad Expressway Pvt. Ltd.,
Bonus one Annuity (for 6 months early completion)
Total period 30 months